How to operate the equipment to produce cloth clip
① Switch on the power supply of the cloth clamping film machine, and then start the test run, and then test whether the electromagnetic brake and parking mechanism are flexible.
② Move the handle of the reducer, change the speed ratio, and test the two speeds of the idler respectively, and observe whether the rotation is correct
Abnormal, with or without noise. Rubber diaphragm manufacturer
③ Check whether the lubrication parts are normal, whether the bearings are overheated, and whether the bearing temperature should not exceed 65 ℃.
④ No load test run shall be less than 30min.
3) Is the load inspection qualified
① Put the cloth clamping diaphragm to be processed on the equipment, start up and test run. After everything is normal, it can be solved according to the requirements of the equipment
Water cloth, check whether the operation of the main idler and the trolley is stable and coordinated. If the vibration is large, the transmission ratio of V-belt pulley at the head of the machine can be replaced
In order to avoid the resonance zone, until the roller runs smoothly at both speeds.
② During the load test, the large, medium and small specifications should be tested respectively in the pipe diameter of sa25.4-330mm.
③ During the load test, the operation of the equipment should be checked continuously